rate analysis of plastering with cement mortar

Provide customers with tailor-made solutions

Rate Analysis of Plastering with Cement Mortar -Quantity ...

Let us take an example of a wall to be plastered: Length of wall = 2m Width of wall = 1.5m Thickness of plaster to be used = 20mm Plaster to be carried out in two layers of 10mm each. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. The rate analysis of mortar need to be done for the calculated quantity required.

Get Price

Rate Analysis For Plastering - Cost Estimation [Civil Planets]

Lets us assume that we need workout rate analysis for 10 Square metre area of inner plastering work. From the mortar mix ratio (as per IS standard), the required mortar ratio is 1:3 and thickness is 15mm. STEP 1 – Mortar Mix Material Calculation. We have detailed the calculation in

Get Price

Rate analysis for plaster work- calculate quantity and ...

Rate analysis of plastering require cement mortar calculation and there is different types of mix ratio of cement sand 1:3,1:4,1:5 1:6 are used in plastering work. Consider thickness of plastering 12mm in case of internal plastering,20mm in case of external plastering and 6mm in case of ceiling plastering.

Get Price

Rate Analysis For Cement Plaster - Civil Lead

Cement Quantity. Now we will calculate the number of cement bags required for 10 square meter areas of plaster. Consider the cement mortar ratio 1:4. Cement quantity = 0.2/ (1 + 4) = 0.04 cubic metre. One is the proportion of cement, and 4 is the proportion of sand in cement mortar 1:4 ratio. Add wastage of 3% = 0.04 × 3% = 0.0012 cubic metre.

Get Price

Rate Analysis for Cement Mortar -Calculate Quantity and

Nov 17, 2014  🕑 Reading time: 1 minute Rate analysis for cement mortar requires estimation of materials for cement mortar, i.e. quantity of cement and sand required for 1m 3 for various proportions, i.e., CM 1:2, 1:4, 1:6, 1:8 etc. So, let us first calculate quantity of cement and sand required for 1m 3 of cement mortar. For 1m 3 of wet cement mortar, 1.3m 3 of cement and sand is required, due to ...

Get Price

How to Calculate rate analysis for plaster work Step by

Calculate the Rate analysis for plaster work 12 mm thick cement plaster on both sides of the wall (10 mx 10 m) using cement mortar (1:3). Given:- Surface area of Wall (both side)=2×10 mx10 m (quantity of work 200 m) Quantity of cement = (4.10/ (3+1)) x1= 1.025 m 3. Step 3:- Cost of Labours (Let us assume work should be done in one day) So, for ...

Get Price

Rate analysis for plastering - Step by Step Procedure for ...

The plaster contains a mixture of sand and cement only. So, to calculate the rate analysis of plaster we have to know the the quantity and rate of each materials. So, Let us take an example. Calculate the rate analysis for plastering of a wall that has to plaster with 12 mm thick plaster having surface area of

Get Price

How to Calculate rate analysis for plaster work Step by Step?

Calculate the Rate analysis for plaster work 12 mm thick cement plaster on both sides of the wall (10 mx 10 m) using cement mortar (1:3). Given:- Surface area of Wall (both side)=2×10 mx10 m (quantity of work 200 m) Quantity of cement = (4.10/ (3+1)) x1= 1.025 m 3. Step 3:- Cost of Labours (Let us assume work should be done in one day) So, for ...

Get Price

Rate Analysis of Plastering Calculator What is Rate ...

Material Calculation for Rate Analysis of Plaster. Material calculation in Rate Analysis like Cement and sand. Cement calculation. Dry Cement mortar volume = 1.33 convert Wet cement. (The Plaster mortar dry volume of plaster decrease volume of dry cement mortar, so 1.33 time of dry mortar) Wastage of cement mortar 33% (1.33) extra

Get Price

Rate Analysis of Plastering Work Calculate Quantity and ...

May 12, 2020  Rateanalysis for steel requires estimation of materials for Plastering work, i.e. quantity of Cement, and sand required for 1 sqm plaster work for column, beam, slab, wall i.e.So, we know that the quantity of cement and in 1 sqm so we can find out the require material for providing, mixing, and laying a plastering work in a place.

Get Price

RATE ANALYSIS OF PLASTERING Civil Engineering - YouTube

Apr 07, 2018  In this video you can learn How to calculate the cost of cement plastering(rate analysis of plaster), This process includes calculating the cost of material...

Get Price

Rate Analysis For Brickwork, Earthwork, Concrete Plaster

Rate Analysis For Plaster Specification. Mortar grade for plaster = 1:6 (1 cement and 6 fine sand) The thickness of plaster = 12 mm for interior wall; The thickness of plaster = 20 mm for the outer wall; Assumptions. 1. Material carriage rates include transportation by mechanical means, loading, unloading and stacking by 6 Beldars / coolies.

Get Price

How do we do rate the analysis of cement plastering? - Quora

Answer: I’m not sure of your question, plastering is an ancient craft and I do not in detail know the sciencethe however I do know basic components and recently company’s such as American clay have introduced natural plaster materials with little to no “off gassing” the veneer cost (finish) is al...

Get Price

Analysis Rates, Analysis and rates for construction work ...

Analysis Rates. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. ... (1/2) plastering with cement or lime mortar. 8.00sqm (80sqft)per mason. 18. Pointing with cement or lime mortar. 10.00sqm (100sqft)per mason. 19. White washing or colour ...

Get Price

CENTRAL PUBLIC WORKS DEPARTMENT ANALYSIS OF

13.1 12 mm cement plaster of mix: 13.1.1 1:4 (1 cement : 4 fine sand) Code No Description Unit Quantity Rate ` Amount ` Details of cost for 10 sqm. MATERIAL: Cement mortar 1 : 4 (1 cement: 4 fine sand) 3.4 Rate as per Item Number 3.4 of SH: Mortars cum0.144 3637.05 523.74 0155 Mason (average) day 0.670 417.00 279.39 0115 Coolie day 0.750 329.00 ...

Get Price

Pwd Civil Works Rate Analysis - land.igorsoloads

Rate Analysis of Plaster. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. Initially, Unit Area is thoroughly analyzed for determining the quantity of material that will be plaster in wet form.

Get Price

Comparison Between Gypsum Plaster and Cement Plaster -

Consumption per (12mm thick plaster) For 1: 4, Cement = 39 kg Sand = 4 cft covering 100 sq.ft. area 40 kg bag – 16 to 18 sq.ft. 25 kg bag – 18 to 21 sq.ft. Compressive strength. 3.5 to 7.5 MPa (depending on ratio) Example: 1:4 – 4 to 5 MPa. 5 – 7 Mpa. Minimum coat thickness. >

Get Price

Ref PPT For Rate Analysis PDF Mortar (Masonry) Brick

-Rate for 1.0 m3 = Rs. -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. Type of material. Quantity. Rate. Per. Amount. Cement Volume = A x t= 100x0.012=1.2 m3 Add 25% for shrinkage = 0.3 m3 Add 40% for wastage = 0.48m3 Total = 1.98 say 2.00 m3 Q=1/5 x 2 = 0 ...

Get Price

Rate Analysis For Gypsum Plaster - Civil Lead

The total rate for 100 square feet of elite-90 gypsum plaster is = 2498.87 + 374.83 = 2873.7 say = 2874.00. So, per square feet rate for elite -90 gypsum plaster = 28.74 say 29/-Per square meter rate for elite -90 gypsum plaster = (28.74 × 10.76) = 309.2 say 309/- The approximate rate for gypsum plaster on the wall will be around 29/- per ...

Get Price

A Comprehensive Guide on Rate Analysis of Civil Works.

Rate Analysis of Plaster. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. Initially, Unit Area is thoroughly analyzed for determining the quantity of material that will be plaster in wet form.

Get Price

diyandbuild Competitive Analysis, Marketing Mix and ...

What marketing strategies does Diyandbuild use? Get traffic statistics, SEO keyword opportunities, audience insights, and competitive analytics for Diyandbuild.

Get Price

Rate Analysis of Plastering Work Calculate Quantity and ...

May 12, 2020  Rateanalysis for steel requires estimation of materials for Plastering work, i.e. quantity of Cement, and sand required for 1 sqm plaster work for column, beam, slab, wall i.e.So, we know that the quantity of cement and in 1 sqm so we

Get Price

RATE ANALYSIS OF CEMENT MORTAR – we civil engineers

Apr 07, 2018  Volume of mortar= 1 m³ Mix Ratio –> 1:6 Dry volume of mortar = Wet volume x 1.33 ∴Dry Volume = 1.0 m³x 1.33 = 1.33 m³ Quantity of Cement = {(Dry Volume of mortar x Cement ratio) /

Get Price

Cement Sand Plaster - Rate Analysis - YouTube

Oct 21, 2021  Hello everyoneIn this video i have explained how to work out the rate analysis for cement sand plaster and also elaborated the mortar thickness and ratio we ...

Get Price

Rate analysis for plastering - GharExpert

Analysis Rates. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc. ... Read more about cement plaster checklist in article ...

Get Price

Rate Analysis Archives - Constroquick

Apr 05, 2021  Rate analysis of plastering with cement mortar is mainly depend on the thickness and area to be plastered. The quantity is to be calculate in plastering is mortar, sanala. The rate of the materials like cement, sand is to assumed. Read More

Get Price

ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS.

rate analysis for 20 mm thick plain plaster with water proofing compound in 2 coats: mortars: 36: rate analysis for cement mortar cm 1:2: 37: rate analysis for cement mortar cm 1:3: 38: rate analysis for cement mortar cm 1:4: 39: rate analysis for cement mortar cm 1:5: 40: rate analysis for cement mortar cm 1:6: 41: rate analysis for lime ...

Get Price

Ref PPT For Rate Analysis PDF Mortar (Masonry) Brick

-Rate for 1.0 m3 = Rs. -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. Type of material. Quantity. Rate. Per. Amount. Cement Volume = A x t= 100x0.012=1.2 m3 Add 25% for shrinkage = 0.3 m3 Add 40% for wastage = 0.48m3 Total = 1.98 say 2.00 m3 Q=1/5 x 2 = 0 ...

Get Price

Perform rate analysis for internal plastering 15mm thick ...

Perform rate analysis for internal plastering 15mm thick in CM 1:4 including scaffolding written 3.2 years ago by sayalibagwe ♦ 8.6k modified 2.2 years ago by sanketshingote ♦ 730

Get Price

Comparison Between Gypsum Plaster and Cement Plaster -

Consumption per (12mm thick plaster) For 1: 4, Cement = 39 kg Sand = 4 cft covering 100 sq.ft. area 40 kg bag – 16 to 18 sq.ft. 25 kg bag – 18 to 21 sq.ft. Compressive strength. 3.5 to 7.5 MPa (depending on ratio) Example: 1:4 – 4 to 5 MPa. 5 – 7 Mpa. Minimum coat thickness. >

Get Price

Pwd Civil Works Rate Analysis - land.igorsoloads

Rate Analysis of Plaster. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. Initially, Unit Area is thoroughly analyzed for determining the quantity of material that will be plaster in wet form.

Get Price

How do we calculate the cost of cement plastering? - Quora

Answer (1 of 4): * Find area where plastering is supposed to done. * Multiply it with thickness (15mm),you got volume. * now add some percentage of volume because of wastage. * Multiply with mortar proportion. For example if mortar proportion c:s=1:6 and Final volume is 1 cumec so, * quantit...

Get Price

Rate analysis in civil engineering - slideshare

Quantity of Materials required for different items of works Name of work Per Unit Materials Quantity Brickwork 10 cum 19x9x9 5000nos Dry cement mortar 3.5cum Half brick 100 sqm 19x9x9 5000nos Random rubble masonry 10 cum stone 12.5cum Dry cement mortar 4.2cum Ashlar masonry 10 cum stone 12.5cum Brick soling 10 sqm 19x9x9 425nos Brick on edge ...

Get Price

Rate Analysis For Gypsum Plaster - Civil Lead

The total rate for 100 square feet of elite-90 gypsum plaster is = 2498.87 + 374.83 = 2873.7 say = 2874.00. So, per square feet rate for elite -90 gypsum plaster = 28.74 say 29/-Per square meter rate for elite -90 gypsum plaster = (28.74 × 10.76) = 309.2 say 309/- The approximate rate for gypsum plaster on the wall will be around 29/- per ...

Get Price

Plaster Calculator - Find cost of plastering walls ...

Wall plastering calculation. The calculations on this page is based on the following assumptions:-. i) The mortar mix is 1:4 (cement:sand) ii) The thickness of plaster for wall interior is taken as 12mm and that of exterior side is 15mm. iii) Wastage of 15%.

Get Price